Dogs, Mt Evans, small projects

The past weeks I have been working on a power supply project and other wondrous things. 

The power supply project started out as, “just swap out all the old capacitors”. I made a trip in to OEM parts, found most of the needed parts and over a few days of getting a few minutes on the power supply and other things, I got them all swapped out.  Hooked it up and it may even be a bit worse than it was before?  Will not regulate the voltage at all now, before it held at about 13 to 16 volts and not it is 15.8 to 16.2 volts?  Well the regulator parts are not much so I ordered replacements for them and will swap that

“And Now the Rest of the Story – “Dogs, Mt Evans, small projects